Student Association Heidelberg
In 2013 LiWooD won an EU-wide tender to construct and design 3 buildings for 265 students. The tender was based on a range of criteria which prioritised factors such as energy costs, maintenance, quality of materials, sustainability and cost. (The buildings were completed and ready for occupation within 6 months from start to finish).